Technical Support Group - Enhanced Day-Ahead Commitment
The objective of this Technical Support Group (TSG) is to offer comments on the design for the enhanced day-ahead commitment (EDAC) project.
Members of the TSG will review the materials provided by the IESO EDAC project team and provide detailed technical advice to the IESO in an efficient and timely manner. Guidance from the TSG will be reflected in updates to the high level design document, to the Stakeholder Advisory Committee (SAC) and the IESO’s recommendations to the Board of Directors.
Background information on day-ahead market evolution can be found here.
Terms of Reference
Working Group
EDAC Market Design, Version 1.0
Working Sessions and Proposed Activities
Date Agenda/Minutes |
Supporting Material |
| February 10, 2009 |
Final Summary of Stakeholder Engagement Effectiveness |
| February 6, 2009 |
Posting of EDAC Market Design, Version 1.0 |
January 29, 2009
Agenda
Minutes |
• Calculating PCG Using Excel
• The Excel tool
• Financially Binding Status Paper
• Presentation
• EDAC Market Design Summary
• EDAC Market Design Issue Log v0.4
Additional Material
• Minimum Loading Point in EDAC |
January 21, 2009
Agenda
Minutes |
• Combined Cycle Modeling
• Scheduling Wheels in EDAC
• Day-Ahead Failure Charge - Linked Wheels
• Day-Ahead Failure Charge - Update
• Production Cost Guarantees
• Incorporating Operating Reserves in the Day-Ahead PCG Calculation (LECG)
• PCG Eligibility
• Financially Binding Status |
December 18, 2008
Agenda
Minutes |
• EDAC Three-Part Offers
• Day Ahead Commitment Withdraw Charge
• Day-Ahead Failure Charge
• Day-Ahead Production Cost Guarantee (DA-PCG)
• DA-PCG for Pseudo Units
• IOG Offset |
November 26, 2008
Agenda
Minutes |
Item 1: Project Schedule and Milestones
Item 2: Pseudo Units Design (Revised November 28, 2008)
• EDAC Combined Cycle Modeling
Item 3: Updated Design Document 
• Presentation
Item 4: IOG Offset
Item 5: Export Failure Charges
Item 6: Ramp Impacts on EDAC |
November 6, 2008
Agenda
Minutes (Revised
Dec. 5, 2008) |
• Financially Binding Status
• Treatment of Quick Start Facilities
• End/Start of Day Boundary Considerations Part 2 - Examples
• Calculation Engine
• Export Discussion Document
• Data Submission Criteria During and After EDAC
• Analysis on the Impact of Ramp in EDAC
• Terms of Reference
• Export Inclusion
• Other Items |
October 15, 2008
Agenda
Minutes |
Discussion items for meeting
• De-commitments and Withdrawals
• Availability Declaration Envelope (ADE)
• Boundary Considerations
• EDAC Calculation Engine
• EDAC Day-Ahead Timelines
• Revised Terms of Reference (Draft)
• Project Schedule |
|
| |